Well, you can get a better idea of the size of addition. The excavator is gone; he took most of the fill dirt, but left some for landscaping, etc. We still have soft spots in the backyard from the sewer fun a month ago, so this will help with filling in.
Crawlspace for office (back 40% of first floor) is about 4 feet deep.
The garage floor will be poured slab on grade, roughly the same elevation as the sidewalk.
The garage floor will be poured slab on grade, roughly the same elevation as the sidewalk.
No comments:
Post a Comment